BESS Pros Survey Report
News

New BESS Industry Survey Reveals Shifting Operations Priorities and Challenges

TWAICE published today the results of its first in-depth industry survey of battery energy storage system (BESS) professionals. 58% of respondents identified system performance and availability as top concerns. 46% overall reported technical issues at least once a month. Only 55% are satisfied with their energy storage software stack.

TWAICE / Feb 13, 2025
Download the content

twaicetech

TWAICE helped me to learn more about: New BESS Industry Survey Reveals Shifting Operations Priorities and Challenges read article here:

www.twaice.com/newsroom/bess-pros-survey-report

#thinktwaice

‍58% of respondents see system performance and availability as top concerns, suggesting need for better data management

TWAICE, the leading provider of battery analytics software, published today the results of its first in-depth industry survey of battery energy storage system (BESS) professionals. For the BESS Pros Survey, TWAICE questioned over 80 engineers, technicians, asset managers, and operators, seeking to understand their most pressing concerns.

The results of the survey revealed that:

  • 58% of respondents identified system performance and availability as top concerns
  • 46% overall reported technical issues at least once a month
    • This figure rose to 53% among asset managers and an overwhelming 73% among operations and maintenance staff – those closest to actual system performance
  • Only 55% are satisfied with their energy storage software stack

With nearly half of all energy storage respondents experiencing frequent technical issues, the “BESS Pros Survey” throws a spotlight on widespread, recurring issues in the energy storage industry that prevent systems from performing at their best. The performance discrepancy reported across different roles further suggests a potential disconnect between those focused on day-to-day operations and the rest of the organization – and underscores the need for a unified data strategy and improved communications among operational stakeholders.

The survey also emphasized the diversity of technologies that respondents use to manage storage data. Notably, only about half of the respondents expressed satisfaction with capabilities provided by their current software stack based on manufacturer-supplied tools. Instead, respondents are increasingly adopting more specialized software tools to address storage-specific challenges. This shift reflects a growing understanding that BESS operations require in-depth analytics, management, and optimization capabilities that more generic energy software may lack.

“The common thread across the survey is that the teams responsible for safeguarding operations and ensuring commercial success lack reliable and enriched data,” said Dr. Stephan Rohr, Founder and co-CEO at TWAICE. “As the industry transitions from simply delivering safe operations to actively monetizing storage assets, it’s crucial that we empower BESS professionals with the right tools for the job at hand. This includes access to data to proactively manage their BESS, mitigate risks, and capitalize on market opportunities with highly available assets.”

Experts at TWAICE conducted the BESS industry survey between October and December 2024, collecting responses from 83 professionals from across EU and US. Most respondents came from independent power producers (35% of respondents); engineering, procurement, and construction firms (19%); and BESS integrators (17%). The majority worked with utility-scale batteries, with 61% expecting their total capacity to exceed 250MWh within two years.

‍

The full BESS Pros Survey Report can be downloaded here.

Webinar

Product Webinar: What’s New with TWAICE Energy Analytics (Spring '25 Edition)

Join our next product webinar and discover the latest features designed to support BESS owners and operators, improve performance, ensure warranty compliance, and maximize revenue.

View Webinar
No items found.

Related Resources

May 14, 2024
May 14, 2024

Study on BESS failures: analysis of failure root cause

A joint study by EPRI, PNNL and TWAICE analyzes aggregated failure data and reveals underlying causes for battery storage failures, offering invaluable insights and recommendations for future engineering and operation
August 7, 2024
August 7, 2024

Simulation Model for Sodium-Ion Batteries

TWAICE introduced an aging model for sodium-ion batteries, the first time a simulation model for battery aging is compatible with non-lithium batteries. This expansion will give battery operators a valuable tool in understanding how to best deploy emerging sodium-ion batteries.
March 25, 2025
March 25, 2025

TWAICE and Modo Energy Debut Integration to Quantify the Financial Impact of BESS Performance Improvements in ERCOT Markets

The battery analytics company also announced two new features to help BESS operators identify and fix performance issues that reduce availability.